Elevated Pressure Relief Valve Platforms
The client needed to install a set of pressure relief valves at two locations on an existing gas process piping system.
The existing concrete pipe rack structure sat at roughly 7.5m above grade and the final elevation of the steel platforms at roughly 11m above grade.
Shop fabricated uprights and skidded platform structures were utilized to allow the installation of accurate, high quality steel structures that could easily be craned into place and attached to the existing concrete supports.